
Home
Resume
Work
Karl Henize
|
|
Spacelab-2
51-F (19)
- CHALLENGER (8)
- Pad 39-A (31)
- 19th Shuttle mission
- 8th Flight OV-099
- RSLS Abort after SSME Ignition (2)
- Abort-to orbit (1)
- Extended mission
Crew:
- Gordon Fullerton (2), Commander
- Roy D. Bridges (1), Jr., Pilot
- F. Story Musgrave (2), Mission Specialist 1
- Anthony W. England (1), Mission Specialist 2
- Karl G. Henize (1), Mission Specialist 3
- Loren W. Acton (1), Payload Specialist 1
- John-David F. Bartoe (1), Payload Specialist 2
Milestones:
- OPF - May 12,1985
- VAB - June 24, 1985
- PAD - June 29, 1985
Payload:
- SPACELAB-2,SAREX(1),CBDE,PGU
Mission Objectives:
Click here for Press Kit
Click here for Additional Info on 51-F
- The Spacelab-2 payload consisted of an igloo and three pallets in the payload bay, containing scientific instruments dedicated to life sciences, plasma physics, astronomy, high-energy astrophysics, solar physics, atmospheric physics and technology research.
- A major objective of the mission was to verify the performance of the Spacelab systems with the orbiter as well as to measure the environment created by the vehicle in space.
Launch:
- July 29, 1985, 5:00:00 p.m. EDT. Launch countdown July 12 halted at T-3 seconds after main engine ignition when a malfunction of number two Space Shuttle Main Engine (SSME) coolant valve caused shutdown of all three main engines. Launch July 29 delayed one hour, 37 minutes due to problem with table maintenance block update uplink. Five minutes, 45 seconds into ascent, number one main engine shutdown prematurely, resulting In an Abort To Orbit (ATO) trajectory. Launch Weight: 252,855 lbs.
Orbit:
- Altitude: 173nm
- Inclination: 49.5 degrees
- Orbits: 127
- Duration: 7 days, 22 hours, 45 minutes; 26 seconds.
- Distance: 3,283,543 miles
Hardware:
- SRB: BI-017
- SRM: M019(HPM)
- ET : 19/LWT-12
- MLP : 2
- SSME-1: SN-2023
- SSME-2: SN-2020
- SSME-3: SN-2021
Landing:
- August 6, 1985, 12:45:26 p.m. PDT, Runway 23, Edwards Air Force Base, Calif. Rollout distance: 8,569 feet. Rollout time: 55 seconds. Mission extended 17 revolutions for additional payload activities due to abort-to-orbit. Orbiter returned to KSC Aug. 11, 1985. Landing Weight: 216,735 lbs.
Mission Highlights:
- Primary payload was Spacelab-2. Despite abort-to-orbit, which required mission replanning, mission declared success. Special part of modular Spacelab system, the Igloo, located at head of three-pallet train, provided on-site support to instruments mounted on pallets. Main mission objective was to verify performance of Spacelab system sand determine interface capability of orbiter, and measure environment induced by spacecraft. Experiments covered life sciences, plasma physics, astronomy, high energy astrophysics, solar physics, atmospheric physics and technology research.
- The flight marked the first time the ESA Instrument Pointing System (IPS) was tested in orbit. This unique experiment pointing enstrument was designed with an accuracy of one arc second. Initially, some problems were experienced when it was commanded to track the Sun. A series of software fixes were made and the problem was corrected.
|
|
 |